We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
EREMA INTAREMA 1309 TVE plus SD
máquinas para processamento de plástico / extrusoras
EREMA INTAREMA 1309 TVE plus SD, Complete regranulation line for LDPE LLDPE HDPE PP PS, Throughput rate 480-750 kg /h depending on materials, Including:, loading conveyor belt, tunnel metal detector, compacting unit, extruder with 90 mm.screw Ø - first part of screw is in new plasma welding., ...
Fabricante: EREMA
Modelo:INTAREMA 1309 TVE plus SD
Número do item: 169766213
Quantidade: 1
Data: 05.08.2026
Ano de fabricação: 2015
Localização:
Itália
ponderano
Preço:
Seller-item-No.:GEMM100
EREMA INTAREMA 1309 TVE plus SD, Complete regranulation line for LDPE
LLDPE HDPE PP PS, Throughput rate 480-750 kg /h depending on
materials, Including:, loading conveyor belt, tunnel metal detector,
compacting unit, extruder with 90 mm.screw Ø - first part of screw is
in new plasma welding., double piston, backflush screen-changer,
double degassing unit,, water ring pelletizer, stainless steel
centrifugal dryer, closed cycle water flow, electric cabinet for full
management, 3 years of work (26.365) hours with commercial LDPE washed
and dried yielding 500-600 kg/h, The line is in very good conditions,
Users manuals, CE compliance declaration, Electrical drawings
available, capacity: 480-750 kg/h depending on materials, conditions:
very good conditions - now disconnected , type: compact line from
scraps to granule, highlighting: The Erema lines are particularly
appreciated for the high efficiency production/consumption and for
having the degassing pump after the screenchanger,
Ao carregar o vídeo, dados serão enviados ao YouTube.
EREMA INTAREMA 1309 TVE plus SD, Complete regranulation line for LDPE
LLDPE HDPE PP PS, Throughput rate 480-750 kg /h depending on
materials, Including:, loading conveyor belt, tunnel metal detector,
compacting unit, extruder with 90 mm.screw Ø - first part of screw is
in new plasma welding., double piston, backflush screen-changer,
double degassing unit,, water ring pelletizer, stainless steel
centrifugal dryer, closed cycle water flow, electric cabinet for full
management, 3 years of work (26.365) hours with commercial LDPE washed
and dried yielding 500-600 kg/h, The line is in very good conditions,
Users manuals, CE compliance declaration, Electrical drawings
available, capacity: 480-750 kg/h depending on materials, conditions:
very good conditions - now disconnected , type: compact line from
scraps to granule, highlighting: The Erema lines are particularly
appreciated for the high efficiency production/consumption and for
having the degassing pump after the screenchanger, seller offer No.
resale GEMM100
Ao carregar o vídeo, dados serão enviados ao YouTube.